試卷年份2017年下半年
試題題型【單選題】
試題內(nèi)容

The project management plan defines how the project is executed , monitored and controlled , and closed . it is progressively elaborated by updates ,and controlled and approved through the perform integrated __process.
A.Cost control
B.Schedule control
C.Change control
D.Risk control

查看答案

相關(guān)試題

70題: 在項(xiàng)目實(shí)施過程中,通過__可以使相關(guān)人員及時(shí)了解項(xiàng)目組在每個(gè)階段所完成的工作、與項(xiàng)目合同和計(jì)劃相吻合(或偏離)的情況、遺留問題以及建議等。
A.項(xiàng)目溝通計(jì)劃
B.項(xiàng)目績(jī)效報(bào)告
C.監(jiān)理實(shí)施細(xì)則
D.監(jiān)理規(guī)劃
答案解析與討論:www.shc2b.com/st/4084522872.html

71題: __concerns a cycle of organizational activity : the acquisition of information from one or more sources , the custodianship and the distribution of that information to those who need it , and its ultimate disposition through archiving or deletion
A.Data management
B.Information management
C.Content management
D.Knowledge management
答案解析與討論:www.shc2b.com/st/408463691.html

72題: System and application access control is to prevent__ access to systems and applications . Access to information and application system functions shall be restricted in accordance with the access control policy .
A.physical
B.special
C.authorized
D.unauthorized
答案解析與討論:www.shc2b.com/st/4084728827.html

74題: Change control within information technology (IT) systems is a formal process used to ensure that changes to product or system are introduced in a controlled and coordinated manner . It__the possibility that unnecessary changes will be introduced to a system without forethought.
A.Adds
B.Removes
C.Produces
D.Reduces
答案解析與討論:www.shc2b.com/st/4084922119.html

75題: ___seeks to build confidence that a future output or an unfinished output ,also known as work in progress will be completed in a manner that meet the specified requirements and expectations
A.Quality assurance 
B.Product assurance
C.Service assurance 
D.Output assurance
答案解析與討論:www.shc2b.com/st/4085012339.html