91成人精品一区在线播放,成人毛片在线播放器,国产精品剧情av,日韩尤物在线,亚洲麻豆视频,岛国免费在线,亚洲a欧美

軟題庫 移動(dòng)APP 掃碼下載APP 隨時(shí)隨地移動(dòng)學(xué)習(xí) 培訓(xùn)課程
試卷名稱 2017年信息系統(tǒng)項(xiàng)目管理師最新英語模擬題(4)
考試中心《2017年信息系統(tǒng)項(xiàng)目管理師最新英語模擬題(4)》在線考試
試卷年份2017年下半年
試題題型【單選題】
試題內(nèi)容

Which of the following is correct for the WBS?
A、Work component descriptions are often collected in a WBS dictionary.
B、WBS is the input of defining scope.
C、The lowest level of WBS is work packages and cannot be further decomposed.
D、The work not being included in WBS may not be outside the scope of the project.


相關(guān)試題

推薦文章